国产精品美女久久久9999丨97精品国产自产在线观看永久丨无码一区二区三区不卡av丨亚洲国产成人手机在线电影丨一区二区三区最新地址

返回管委會首頁
繁體 |English |日語 |無障礙 |關(guān)懷版
Home page > Category Report > Infrastructure & Ecology

Renovation of power supply system completed for PV power utilization

Date:2024-10-22 09:46:00|Source:|Font Size: AAA

The renovation of the power supply system for the use of the PV power generation systems newly installed on the roofs of several buildings in Zone 6 of Loufeng Ventures Square in SIP’s Loufeng Sub-district was completed recently, marking a significant step of the sub-district in energy innovation.

Loufeng Sub-district has been striving to promote low-carbon development of industries and increase the use of renewable energy in recent years. The project was one of the efforts for this purpose.

The roof-mounted solar panels are expected to generate about 37.5 million kWh of electricity over the operation cycle which is designed to last 25 years, equaling to reducing standard coal consumption by about 600 tons/year and carbon dioxide emissions by about 1,495.5 tons/year.

The electricity generated under the project will be a substitution for part of the public power supply to enterprises in the industrial cluster.

October 21, 2024

Copyright ? m.wfzhuangchen.com   |  Contact us
主站蜘蛛池模板: 土默特左旗| 子长县| 平江县| 镇宁| 武宁县| 永修县| 芜湖市| 廊坊市| 昌平区| 邵武市| 望江县| 钦州市| 崇仁县| 肇源县| 石家庄市| 慈利县| 体育| 赤壁市| 长海县| 广河县| 虎林市| 宁强县| 全椒县| 桑日县| 玛曲县| 合肥市| 松阳县| 都安| 玛多县| 南华县| 东港市| 木里| 理塘县| 江都市| 汕尾市| 正蓝旗| 汝南县| 丹江口市| 永登县| 资阳市| 泰宁县|